Gantt Chart Timeline (Weeks 7–16)

Status legend: ✅ Completed 🔄 In Progress 🕒 Planned
Week Task Category Planned Work Status
Week 7 Hardware Integration Verify TB4 base, networking, teleop mobility ✅
  Sensors Bring up LiDAR + RGB-D drivers; visualize raw topics ✅
  Controls & Autonomy Validate /cmd_vel, odom, TF tree ✅
  Interface & Data Basic RViz setup (robot model + LiDAR) ✅
  Milestone Robot moves via teleop; all sensors online ✅
Week 8 Hardware Integration Mount camera; cable management ✅
  Sensors Calibrate OAK-D; verify compressed RGB stream ✅
  Controls & Autonomy Configure WiFi-based OAK-D topic subscription ✅
  Interface & Data RViz ArUco debug image visualization ✅
  Milestone Stable camera pipeline over ROS 2 WiFi ✅
Week 9 Hardware Integration Long-duration hardware test ✅
  Sensors ArUco board detection and solvePnP pose estimation ✅
  Controls & Autonomy Camera frame coordinate convention established ✅
  Interface & Data Visualize board pose + TF in RViz2 ✅
  Milestone Board pose estimated in real time on hardware ✅
Week 10 Hardware Integration Hardware test with TurtleBot 4 moving ✅
  Sensors EMA smoothing + board visibility reporting ✅
  Controls & Autonomy Direct velocity control via robot_09/cmd_vel ✅
  Interface & Data RViz2 markers for board center, orientation, distance ✅
  Milestone Robot receives and responds to velocity commands ✅
Week 11 Hardware Integration End-to-end hardware pipeline test ✅
  Sensors Compressed image decoding; 4-case quaternion conversion ✅
  Controls & Autonomy Proportional follow controller with deadband ✅
  Interface & Data TF broadcast camera_frame → board_frame ✅
  Milestone Robot follows ArUco board in open space ✅
Week 12 Hardware Integration Stress-test follow runs on TurtleBot 4 ✅
  Sensors Pose age timeout; board loss detection ✅
  Controls & Autonomy FOLLOW / LOST / SEARCH state machine ✅
  Interface & Data Coordinator state markers in RViz2 ✅
  Milestone Follow + recovery pipeline working on hardware ✅
Week 13 Hardware Integration Validate backward motion and clamping behavior ✅
  Sensors EKF / UKF / Particle Filter implemented in simulation ✅
  Controls & Autonomy goal_generator placeholder integrated; pipeline end-to-end ✅
  Interface & Data Filter comparison visualization; Milestone 2 report published ✅
  Milestone Milestone 2 submitted; full pipeline operational on hardware ✅
Week 14 Hardware Integration Minor stabilization and parameter tuning ✅
  Sensors KF/PF tracker integrated; measured/predicted/lost states validated ✅
  Controls & Autonomy PD angular controller + deadband added; oscillation eliminated ✅
  Interface & Data Debug image pipeline; low-latency RViz2 camera feed ✅
  Milestone Prediction-based following working end-to-end on hardware ✅
Week 15 Hardware Integration Hardware configuration frozen; COLCON_IGNORE structure set up ✅
  Sensors SLAM integration validated with namespace:=/robot_09 ✅
  Controls & Autonomy Parameters frozen; OpenCV version compatibility fix applied ✅
  Interface & Data Master launch file; RViz2 config saved; website updated ✅
  Milestone System ready for final demo ✅
Week 16 Hardware Integration Demo prep: charging, spares, setup ✅
  Sensors Health checks; board detection verified ✅
  Controls & Autonomy Final scripted demo executed ✅
  Interface & Data Milestone 3 report published; demo videos captured ✅
  Milestone Final demo completed ✅